In a two-shift rota, two teams take turns working early and late. To build one, start with the hours your warehouse runs and the number of people you need on the floor at any given time. Then assign the shifts and work out who covers breaks, absences and handovers.
This two-week example starts with six employees who appear to cover every shift. Once their breaks are accounted for, the rota is short by 15 hours of cover each week. Here is how to find that gap and check whether the handover between teams also works.
When does a two-shift pattern fit your warehouse?
In this example, Team A works early one week and late the next. Team B does the reverse. That is one possible cycle. TNO's research highlights the importance of enough rest between successive shifts. Check the rest periods when you adapt the pattern for your own team.
First decide which days and hours need cover for receiving, storage, picking and dispatch. Note which jobs must happen at the same time. A dispatch deadline, for instance, may require more people than simply opening the building.
If deliveries and orders follow a fairly regular weekly pattern, you can plan a recurring base rota. If demand changes sharply, identify when you need extra cover. TNO advises including peaks and quieter periods in staffing plans.
For the wider process, including availability and sharing the final schedule, see our guide to creating a staff rota.
A two-week, two-shift rota example
Assume the following for this fictional warehouse:
- It operates Monday to Friday from 06:00 to 22:00.
- The early shift runs from 06:00 to 14:00; the late shift runs from 14:00 to 22:00.
- For this exercise, three people must be available throughout those hours.
- Each team has three employees in the base rota.
- There is no weekend staffing requirement in this example.
These times and numbers are only a worked example. Adjust them to your own staffing needs. Breaks and handovers are checked separately below.
Swipe left to view the full table
| Week | Team | Monday to Friday | Saturday and Sunday |
|---|---|---|---|
| 1 | A | Early, 06:00 to 14:00 | Off |
| 1 | B | Late, 14:00 to 22:00 | Off |
| 2 | A | Late, 14:00 to 22:00 | Off |
| 2 | B | Early, 06:00 to 14:00 | Off |
| 3 | A and B | Repeat week 1 | Off |
Over two weeks, each team works five early and five late shifts. Add names and dates, then check the change from week 2 back to week 1. The cycle does not stop at the edge of a spreadsheet.
Two teams do not necessarily mean you have enough people. The six employees fill the base pattern here. Nobody has yet been assigned to cover their breaks or absences.
Calculate scheduled time and working cover separately
The warehouse operates for 16 hours a day. With three people needed at all times, that calls for 16 × 3 = 48 hours of staff cover per day.
The base rota has six eight-hour shifts, also giving 48 hours between shift start and finish times. For this exercise, assume that each person takes a 30-minute break during their shift and cannot cover warehouse work at that time.
Swipe left to view the full table
| Daily check | Calculation | Result |
|---|---|---|
| Cover needed | 16 hours × 3 people | 48 hours |
| Scheduled time before breaks | 6 shifts × 8 hours | 48 hours |
| Break time within those shifts | 6 × 0.5 hour | 3 hours |
| Working cover from the base rota | 48 hours minus 3 hours | 45 hours |
| Cover still needed | 48 hours minus 45 hours | 3 hours |
Across five working days, the warehouse needs 240 hours of cover. After breaks, the six employees provide 225. The shortfall is 15 hours across the week. Those hours fall at particular times, so first identify when cover is needed and what work the replacement employee must be able to do.
Staggering breaks stops everyone leaving at once, but does not remove the gap. When one of the three needed employees takes a break, two remain. Arrange suitable cover, or check whether the work can safely be organised differently at that time.
A replacement provides some of the 48 hours of daily cover already calculated. Do not add the same requirement again as new work. Track scheduled presence and paid time separately too. This calculation measures available cover, not wages or shift allowances.
For breaks in the Netherlands, the Dutch government explains how statutory rules, collective agreements and workplace arrangements interact. The 30-minute assumption above does not replace a check of the rules that apply to your team.
Put the handover on the timeline
In the base rota, the early shift ends exactly when the late shift starts. There is no overlap for a spoken handover.
Decide what the next team needs to know, such as a shipment that needs attention or unfinished work. Then decide who passes that information on, how long they need and which positions must remain staffed while they speak.
If two shift leads need 15 minutes together, schedule that overlap. Check who covers their floor duties during it. Moving one start time earlier does not, by itself, show that the floor still has enough people.
The 15 minutes are an example, not a standard handover duration. The hours table above does not include this overlap. Put your actual handover on the timeline before settling the final hours total.
Test the cycle with one person absent
Take an early shift in week 2 and remove one person. Two remain, while this example needs three at once, even before you check their breaks.
For that shift, ask:
- Which task or required role now has no cover?
- Who is available at that time and able to do the work?
- What other shift or task would be affected by moving them?
- Does the changed rota still comply with the rules and agreements that apply?
- Who decides what to do if no suitable replacement is available?
Moving somebody from the late team to the early shift may simply transfer the shortage to the afternoon. A team's day off is not automatically an on-call shift. Name the replacement and check the resulting rota rather than writing down that somebody can help.
Repeat this check for leave you already know about. It will show which shifts still need cover.
Check each person's shifts before repeating the cycle
A team may follow a clear pattern while one employee gets an awkward transition after a swap or an extra shift. Check the rota with real dates and names, not just the letters E and L.
The Dutch Working Hours Act covers working hours, rest, breaks and night work. Specific rules and exceptions apply to some workers and types of work. Start with the Dutch government's explanation of working-time rules and check the relevant collective agreement and workplace arrangements.
This guide concerns warehouse planning in the Netherlands. Before using a rota, check which agreements, allowances and rules apply to your employees. Transport work may have different conditions. This worked example is not a legal review of a completed rota.
Bring the pattern into your daily planning
Keep the base cycle and any exceptions easy to distinguish. Agree who handles leave, swaps and extra cover, and where employees can find the current version. Our Excel and WhatsApp migration checklist helps you set those responsibilities.
With Teamspot for logistics, you can create a rota proposal using the staffing demand and planning rules you set. A manager reviews assigned and open shifts before applying it.
For a demo, bring an anonymised shift cycle. Walk through breaks, handovers and what changes when somebody calls in sick. Show the pattern you want to repeat and ask which steps Teamspot supports.